Use this form to request fabrication of an IC project. You must know
the project's Design Number and Design Password. When you have
successfully submitted this form, MOSIS will either attempt to
retrieve your layout file via FTP or wait for you to send your layout
file to us via FTP, depending on which layout transfer section of the
form you filled out. Once your layout file is received and the
computed checksum matches the one you declared in this form, your
design will be queued for manufacturability review. At the conclusion
of the check, you will receive a separate e-mail message. If your
design passes manufacturability review, it will be queued for
fabrication on the next available run that is compatible with your
technology code and meets any foundry restriction you have specified.
See the
MOSIS Fabrication Schedule for the dates of scheduled runs.
If your layout file has been successfully transferred to MOSIS and
your project did not get into the fab queue due to missing or
incorrect information (pad count, design size estimate, technology
code, lambda, etc), you should use the
Update Form
to add missing information or correct wrong values.
If your project is already in the fab queue and you want to submit
a revised design, you must first cancel fabrication with the
Cancel Fabrication Form.