|
|
MOSIS is offering the following multiproject wafer (MPW) runs
through ON Semiconductor. To be considered ontime for an MPW run,
layout and paperwork are due to MOSIS by 1 PM PT
(Pacific/California Time) on the date listed.
ON Semiconductor
(formerly AMIS)
Fabrication Schedule Through MOSIS
2010 Fabrication Schedule
|
Technology
|
Customer Submission Date
|
|
Jan
|
Feb
|
Mar
|
Apr
|
May
|
Jun
|
Jul
|
Aug
|
Sep
|
Oct
|
Nov
|
Dec
|
0.35 µm
I3T80
|
4
|
|
|
5
|
|
|
5
|
|
|
4
|
|
|
|
I3T50
|
|
1
|
|
|
10
|
|
|
2
|
|
|
1
|
|
|
I3T25
|
|
8
|
|
5
|
|
1
|
|
|
13
|
|
15
|
|
0.50 µm
C5F/N
|
19,1
25
|
|
29
|
|
24
|
|
19,1
26
|
|
27
|
|
29
|
|
0.70 µm
I2T100
|
11
|
|
29
|
|
|
14
|
|
30
|
|
|
8
|
|
|
I2T30
|
11
|
|
29
|
|
|
14
|
|
30
|
 
|
|
8
|
|
1 MEP Only. No commercial submissions will be accepted for
these runs.
|
Dedicated (COT) runs through MOSIS are also available in the above
processes. Dedicated runs can be scheduled to start at any time.
For more information about participating on these or other runs
through MOSIS, please contact
support@mosis.com.
Related Links
ON Semiconductor Processes
ON Semiconductor Document Access
ON Semiconductor Design Kits
|
|
|