|
|
Peregrine Fabrication
Technology descriptions, MPW fabrication schedule, and vendor
document access procedures for the Peregrine fabrication processes
available through MOSIS.
Peregrine Fabrication Processes
The Peregrine fabrication processes available through MOSIS include
both 0.50 µm SOS process (FC and FA), and the two versions of
the 0.25 µm SOS process (GA and GC).
Peregrine Fabrication Schedule
MOSIS offers access to Peregrine multiproject wafer (MPW) runs. To be
considered ontime for an MPW run, layout and paperwork are due to
MOSIS by 1 PM PT (Pacific/California Time) on the date listed.
Peregrine Manual and Design Kit
The Peregrine manual and Cadence design kit are available upon
approval for MOSIS customers.
How To Access Peregrine Process and Documents
General instructions for accessing Peregrine process, design rules,
and cell libraries through MOSIS.
|
Related Links
MOSIS Fabrication Processes
|
|
|