MOSIS Run Status Report


Status of Run V84A


Generated on: 13-DEC-2018 04:12:46

Status of run: V84A            Type: SHR
Scheduled: 25-APR-18
Closed: 25-APR-18
Tapeout: 24-APR-18
   
Masks: TSMC
Wafers: TSMC
Technology: TSMC_013
Status: Y
   
Wafer Process: MM_8M_1N with G,2.5V,MET7,MET8,VTH_N,VTL_P,VTL_N,VTH_P,DNW,PM,CTM,1N,1.0FF

Wafer Lots             Package Lots
Lot Received            
1 28-JUN-18
Lot Type Sent to Packager       Recd from Packager      
1 VIRTUAL 28-JUN-18 28-JUN-18