GlobalFoundries Fabrication Schedule — 2018


MOSIS offers access to the GlobalShuttle MPW (GF lead) runs - as well as MOSIS-lead (GFUS) MPW runs. To be considered on time for an GlobalShuttle run, please refer to the GlobalShuttle timeline. Also the GlobalShuttle maximum allowed die size is 12.5 mm x 12.5 mm. To be considered on time for an MOSIS lead (GFUS) MPW run, layout and paperwork must be received at MOSIS by 1:00 PM Pacific Time on the date listed. All runs identified as GFUS processes can be fabricated as ITAR compliant.




Participants on GlobalFoundries MPW runs must adhere to the timeline.
Dedicated Runs are also available and can be scheduled to start at any time for some GF processes.

2018 Fabrication Schedule


See Fabrication Schedule for 2017

The schedule for the balance of 2018 will be posted when available

Technology MOSIS Scheduled Run Date
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
14LPP 14 nm 14 11
22FDX 22 nm 15 12 12 16 14 18
28HPP 28 nm  8  9
28SLP 28 nm  8  9
40LP 40 nm  5  2  4  6
GFUS 45RFSOI A 45 nm 20 21 20 19
55LPX F 55 nm 15 12 14
65G C 65 nm 26
65LPE C 65 nm 26
GFUS 9HP 90 nm 12 11 10  3
GFUS 9WG A 90 nm 26 29 27 26
013 G 0.13 µm  8  5  7
013_LP 0.13 µm  8  5  7
GFUS 8HP 0.13 µm 15  5  7  2  4  5
GFUS 8WL 0.13 µm 26 25 25 10
GFUS 8XP 0.13 µm 12 14 13 12
018 0.18 µm  5 14
018_BCD 0.18 µm  5 14
018_BCD_ISO 0.18 µm  5 14
GFUS 7SW 0.18 µm 12  9
GFUS 7WL 0.18 µm 26 23 16 15
GFUS 8SW 0.18 µm 19 18 17 10
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
A Contact MOSIS Support if designs are planned.
C 55 nm is supported on these runs.
F 55LPe is supported on these runs.
G BCD and BCDLite are supported on these runs.

For more information about participating on these or other runs through MOSIS, please contact MOSIS Customer Support.

Related Links